Modern equipment for laying the pipeline and communications is divided into two types: used in the trench laying of the pipeline and networks and a tactranschic laying of communications. Each of these two types of equipment has its own advantages, but with a closer acquaintance with tarantine technology (horizontal drilling technology) it becomes obvious that this method of conducting pipelines and networks is as effective as possible.
Advantages of the technology of the GND
First of all, the GND technology made it possible to testless construction under railway tracks, roads, rivers. The next advantage of this technology is to reduce the cost of construction and terms of construction work. This became possible, mainly due to the autonomous operation of this equipment and the lack of its dependence on centralized energy carriers.
The GNBL method is the most to preserve the unique landscape of the area on which work is carried out. And since the negative influences on the terrain are minimal, this technology practically excludes the negative impact on the life of people living in this area.
Advantages of PND PND installation
Today no one disputes the convenience and safety of plastic pipes. Such pipes are much cheaper than metal, which allows you to reduce construction costs. It is possible to install PND pipes both in the cold and in the hot water supply system, since their operation is permissible at almost any temperature. PND pipeline is distinguished by a long service life (up to 50 years), since plastic pipes are not destroyed and are not deformed over time, like steel. In addition, polyethylene (PND) pipes are distinguished by high environmental friendliness, high throughput, lightness and elasticity. And most importantly, the installation of PND pipes does not require long and expensive staff training programs. These advantages make plastic pipes an excellent material for conducting a pipeline with a tassurous way.
Testranchic layout method of polyethylene pipes
Testranchic laying of polyethylene pipes is usually carried out by inclined and horizontal directed drilling. First, in a certain place, an inclined drilling of the well is made, into which the pipeline will be delayed. Then this well expands with the help of drilling heads with a beveled front part. When a drilling head appears at a given point, it is immediately dismantled and an expander is installed instead with the desired diameter. And the pipe of PND is already attached to the expander.
Thanks to modern technologies, laying polyethylene pipes occurs using a computer monitoring system. This system allows automatically tracking the operation of the drilling rig. Thus, modern computer systems make it possible to optimize the drilling process as possible.