Why is the repair in the toilet and bathrooms significantly differ and requires the highest costs and experience of the contractor.
We will try to answer this and other questions in this article. Repair in the toilet and the bathroom can be attributed to the second stage of major repairs, t. e after some dismantling black work is completed.
First of all, the cover is always removed, as a rule it is plaster and tiles, after which, by the way, the room itself will become much more spacious since it will increase by 3-6 cm on each side. Further, if we are talking about the toilet, the toilet is removed and the floor is aligned. It is very convenient to align the floor with special mixtures, they will usually dry for two days. But the new toilet will not be able to immediately put it, since we still have the walls that we will even rely on the flat floor, it will take another day. After that the tile is laid, first on the floor then on the walls and that two more days.
So it turns out that the new toilet is installed on the 5th day, so you need to think about it in advance how you will do.
The next step will be all the final work, such as the grout of the tiles, the installation of skirting boards, some kind of cabinets, stands or something else. As a rule, the repair in the toilet occurs in a week sometimes lasts longer depending on the complexity, but it should not be faster than you will lose as.