The drilling of industrial water wells has features prescribed in regulatory acts. For example, in order to use water resources in large volumes, it is necessary to arrange a license, correctly design a water intake node. Only after these actions can we drill wells for water in the Moscow region.
Features of industrial wells
This option is an excellent alternative to centralized water supply for large facilities, which include enterprises, cottage villages, factories, farms and much more. With their help, uninterrupted supply of clean water for a long time is ensured. The industrial well of one of the features has great performance, which can reach 10,000 cubic meters. m. That is why increased requirements are imposed on their creation.
What is required to obtain a license?
License – a set of permits, which includes:
calculation of the balance of drainage and water consumption;
Act of survey of the territory;
conclusion of geophysical research;
paperwork and submitting them to a specialized body;
Examination of the license;
registration of the well;
Passport registration.
If a license for a well for legal entities is issued, then it is necessary to provide:
statement;
power of attorney;
certificates confirming that the person is legal;
Charter and constituent documents and other documents.
The project of an industrial well
It is developed in accordance with the technical assignment provided by the customer. On its basis, an estimate is compiled. It should reflect:
well depth and its performance;
technical characteristics;
All necessary equipment and the plan for its placement are prescribed;
The preliminary price is indicated taking into account transport costs.
It should be noted that the price of the soil can have an impact on the price.
Arrangement
After the main works related to drilling were performed and the analysis of water from the well was taken, the process of arrangement begins. It consists in water supply to the house. Must be taken into account the climate of the area where these manipulations are carried out. This is due to the fact that the pipes should be laid at such a depth so as not to freeze. If necessary, they are insulated. Turnkey well arrangement is performed in several stages:
Cesson installation;
descent and installation of the pump;
Installation of the accumulator, automation systems;
Laying of the pipeline.