Construction of pipelines and the construction of trunk pipelines

March 14, 2019

Magistral pipelines are pipe systems with a diameter of up to 1450 mm. transporting various energy – and heat carriers to the place of their consumption. Such highways are most often laid underground, which increases the safety of transportation and service life of such a pipeline.

Modern main pipelines are large integrated systems that provide the main transport function of pipes. In addition to the pipeline, the complex includes structures, lines and substations providing repairs, corrosion and electrical protection, fire safety, outbuildings, head control centers, as well as their own power lines for servicing pipelines. The complex also includes premises and structures for emergency discharge of products and condensate, storage stations of products.

Stages of designing pipelines

The beginning of the process begins with the collection of information and conduct a large number of geo-, hydrochlorical research, as well as collecting geographical and economic data in the area where construction is planned. How necessary and justified the construction of the highway is and whether it is needed by consumers. Based on these and some other data, a package of technical documentation is drawn up, which forms the basis of a feasibility study for the construction of the pipeline.

As a result, the diameter of the pipes, working pressure and the required number of pumping stations are calculated, also receive the estimated estimate and comparison of the economic feasibility of using the pipeline compared to other methods of transportation.

As soon as the technical and economic justification is ready, they give out a task for the proper design of the pipeline. It should indicate the purpose, annual bandwidth, breakdown by queues and construction schedule indicating the initial, intermediate and end stations, as well as the properties of transported products.

All data specified in the task must be reflected in the project. At the stage of technical design, research and research are carried out, technological and engineering solutions are being developed, issues related to environmental protection and legal nuances are resolved.

Laying trunk pipelines

On existing SNiPs, pipelines should be held underground. The minimum power of the pipes depends on their diameter and is in the range of 0.8-1 m. In the event of insurmountable obstacles, a small part of them can rise above the soil on embankments or supports. Technical corridors of the pipeline cannot serve as additional ways for laying other communications, but can be adjacent to other highways.

The pipeline route should be safe, available for repair and maintenance, safe for settlements and the environment. For laying, use pipes made of high -quality low -alloy steel, which has passed 100% non -destructive control (for example, ultrasound). They are produced by various diameters for different throughput, and their length ranges from 10-11 m. The pipe may have and not have a weld seam. In this case, the seam itself should be equal in terms of strength itself. The parameter of curvature is determined not by a large 1.5 mm per 1 m length.

The pipeline cannot pass within any settlements, industrial enterprises, port airfields or marinas. It is forbidden to use as technological, transport or other other corridors not intended for the highway.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

About spring holidays in Great Britain: features and types

April 13, 2025

Traditions and holidays of Great Britain

April 13, 2025

New Year’s holidays in Britain: traditions and rules of celebration

April 13, 2025
Latest Posts

Лучшие современные книги и их описание для любителей литературы и новых идей

September 30, 2025

Требования к стеклу для грузовиков и советы по правильному выбору

September 16, 2025

Evolution and Technical Specifications of the Hyundai Elantra: A Comprehensive Overview

September 16, 2025

Сборка шкафа купе: на что следует обратить внимание и советы

September 13, 2025
Popular

What time is it best to inspect at home before buying or renting?

November 20, 2024

If you want to buy a house or rent an apartment, then a reasonable decision…

Where you can go and what to see in Costa del Sol

October 31, 2018

Dismantling and creating openings under the door and windows using diamond technologies

May 30, 2018

Building costs of a private house

December 20, 2024
Latest Posts

Лучшие современные книги и их описание для любителей литературы и новых идей

September 30, 2025

Требования к стеклу для грузовиков и советы по правильному выбору

September 16, 2025

Evolution and Technical Specifications of the Hyundai Elantra: A Comprehensive Overview

September 16, 2025
Featured Posts

Glazing – a service that is in high demand

January 10, 2019

Stages of conducting work on the construction of a house.

December 13, 2024

Bathroom furniture on order

November 26, 2018
Don't Miss

Reasons to buy a Moroccan carpet

May 4, 2018

The use of hydraulic cylinders in special equipment

February 8, 2019

You are sure that you want to live in the city, and do not dream of a country house?

December 6, 2024
  • News
  • Society
  • Holidays
  • Real estate
  • Auto
  • House
  • Investment
© 2017-2025, Britain News - everbritain.com.

Type above and press Enter to search. Press Esc to cancel.