Close Menu
  • News
  • Society
  • Holidays
  • Real estate
  • Auto
  • House
  • Investment
Facebook X (Twitter) Instagram
Britain News – economy, investments, society
  • News
  • Society
  • Holidays
  • Real estate
  • Auto
  • House
  • Investment
Britain News – economy, investments, society
Home»Investment»Industrial water well: license, project, drilling and arrangement

Industrial water well: license, project, drilling and arrangement

February 18, 2019

The drilling of industrial water wells has features prescribed in regulatory acts. For example, in order to use water resources in large volumes, it is necessary to arrange a license, correctly design a water intake node. Only after these actions can we drill wells for water in the Moscow region.

Features of industrial wells

This option is an excellent alternative to centralized water supply for large facilities, which include enterprises, cottage villages, factories, farms and much more. With their help, uninterrupted supply of clean water for a long time is ensured. The industrial well of one of the features has great performance, which can reach 10,000 cubic meters. m. That is why increased requirements are imposed on their creation.

What is required to obtain a license?

License – a set of permits, which includes:

calculation of the balance of drainage and water consumption;

Act of survey of the territory;

conclusion of geophysical research;

paperwork and submitting them to a specialized body;

Examination of the license;

registration of the well;

Passport registration.

If a license for a well for legal entities is issued, then it is necessary to provide:

statement;

power of attorney;

certificates confirming that the person is legal;

Charter and constituent documents and other documents.

The project of an industrial well

It is developed in accordance with the technical assignment provided by the customer. On its basis, an estimate is compiled. It should reflect:

well depth and its performance;

technical characteristics;

All necessary equipment and the plan for its placement are prescribed;

The preliminary price is indicated taking into account transport costs.

It should be noted that the price of the soil can have an impact on the price.

Arrangement

After the main works related to drilling were performed and the analysis of water from the well was taken, the process of arrangement begins. It consists in water supply to the house. Must be taken into account the climate of the area where these manipulations are carried out. This is due to the fact that the pipes should be laid at such a depth so as not to freeze. If necessary, they are insulated. Turnkey well arrangement is performed in several stages:

Cesson installation;

descent and installation of the pump;

Installation of the accumulator, automation systems;

Laying of the pipeline.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Investing in real estate in England: ideas and advice

April 13, 2025

Investing in business in England: some ideas and recommendations

April 13, 2025

How to invest in the UK: ideas and opportunities

April 13, 2025
Latest Posts

Лучшие современные книги и их описание для любителей литературы и новых идей

September 30, 2025

Требования к стеклу для грузовиков и советы по правильному выбору

September 16, 2025

Evolution and Technical Specifications of the Hyundai Elantra: A Comprehensive Overview

September 16, 2025

Сборка шкафа купе: на что следует обратить внимание и советы

September 13, 2025
Popular

Hotels in high-tech format-a new trend in the tourist business

April 17, 2018

If you look at the modern hotel services market, you can be at a loss.

Ground confrontation: laminate or parquet board.

July 18, 2018

Аренда транспорта с водителем в городе Санкт-Петербург

September 6, 2025

Rules that will help to navigate when choosing doors

February 6, 2019
Latest Posts

Лучшие современные книги и их описание для любителей литературы и новых идей

September 30, 2025

Требования к стеклу для грузовиков и советы по правильному выбору

September 16, 2025

Evolution and Technical Specifications of the Hyundai Elantra: A Comprehensive Overview

September 16, 2025
Featured Posts

The main attractions of Hanover

December 27, 2018

Exotic short -haired cat – a variant of the classic Persian

November 26, 2024

Fashion show as a method of purchase.

December 27, 2024
Don't Miss

Stretch ceilings: stylish and practical

December 5, 2018

Glazing – a service that is in high demand

January 10, 2019

How to build a bathhouse correctly so as not to “heat the air”.

January 9, 2019
  • News
  • Society
  • Holidays
  • Real estate
  • Auto
  • House
  • Investment
© 2017-2025, Britain News - everbritain.com.

Type above and press Enter to search. Press Esc to cancel.